Thursday, November 11, 2010

Lakeside High Groundbreaking November 16 4:00

Northlake Community and Lakeside Alumni Invited

Contact:

Joe Reed, Principal

Lakeside High School
3801 Briarcliff Road
Atlanta, GA 30345
678-874-6702


For Immediate Release
November 10, 2010

Lakeside High School Sets Major Construction and Renovation Project
Groundbreaking Ceremony for Tuesday, November 16 at 4 p.m.

Atlanta – Lakeside-DeKalb High School has scheduled a groundbreaking ceremony for Tuesday, November 16 at 4 p.m. to commemorate the start of major construction additions and renovations of the school facilities located at 3801 Briarcliff Road.

The event, to be held just due east of the gymnasium, will be hosted by Lakeside principal Joe Reed and invited attendees include various DeKalb County School System dignitaries.

Construction and renovations to the school, which was opened in 1965, include the addition of a 600-seat fine arts auditorium, 25 new classrooms, new science labs, career tech facilities and new special needs classrooms. Locker rooms, restrooms, cafeteria, media center and other spaces will get much needed makeovers, and the facility’s technology, security and ADA accessibility will also be upgraded.

According to Mr. Reed, the challenge of continuing to educate students amidst the two-year project is one that the school and community will pull together to get through. “Lakeside and its surrounding community have a strong tradition of working together,” said Mr. Reed. “We’ll manage through this process that ultimately will benefit our community, faculty and most importantly our students.” He added, “I was a student here back in the 1970’s and not much has changed since then. That just goes to show you how much this project is needed.”

Funding for the $24 million project comes from the Special Purpose Local Option Sales Tax (SPLOST) III used to pay for necessary school system capital improvements including building improvements, new schools, classroom additions, technology, and transportation needs. Project architect is Manley, Spangler & Smith and construction will be handled by the Hogan Construction Group.

Numerous other additions and enhancements to the facilities that will not be covered by the SPLOST funds are to be funded through “The Valhalla Project” by way of the Lakeside High School Foundation, an independent 501(c)(3) corporation. More information on the Foundation can be found and donations can be made at http://www.lakesidefoundation.org/.


About Lakeside High School

Tradition. Legacy. Expectation. Reputation. Lakeside High School gives life to each. Opened in 1965, Lakeside has built traditions of excellence and top achievement in academics, athletics, visual and performing arts, citizenship and community service. Such are the traditions of being a Lakeside Viking. With its vibrant, diverse and high-performing students, teachers and administrators, Lakeside is poised to remain a pillar of the community for many years to come.

No comments:

Post a Comment